|
|
Working group: Factory planningThe field of facility planning is characterised by
planning, realising and operating production systems in
particular as well as an entire factory with its main,
auxiliary and secondary fields. Facility planning covers a
wide range of topics: from an integrated product and process
organisation or developing production systems to dimensioning,
structuring and designing. Furthermore, facility planning
deals with setting up and running a factory (this includes for
example; project management, logistics of production or
production planning and control). In this context, special
methods, data models, tools, performance measurement
instruments and case studies are presented. The following pages provide detailed information about our
research work and
consulting activities. |
Dates
10.05.2012
-
11.05.2012
Contact
Head
Prof. Dr.-Ing. habil. Thorsten Schmidt Secretary Andrea Schulz Phone: +49 351 463-32538 Fax: +49 351 463-35499 Office Schumann-Bau, Room A 312 Münchner Platz 3 01187 Dresden-Plauen How to find us. Mail to Technische Universtät Dresden Institut für Technische Logistik und Arbeitssysteme Professur für Technische Logistik 01062 Dresden Bulk mail to Technische Universtät Dresden Institut für Technische Logistik und Arbeitssysteme Professur für Technische Logistik Helmholtzstraße 10 01069 Dresden |