Completed projects – new concretes and construction methods
Concrete light. Future concrete structures using bionic, mathematical and engineering formfinding principles (SPP 1542) further details
Funding: DFG
Period: 07/2011 – 06/2014
Concrete Hinges in Bridge Building further details
Funding: Deutscher Beton- und Bautechnik-Verein e. V. (DBV)
Period: 01/2009 – 12/2009
Enhancement of the prediction accuracy of small crack width further details
Funding: DIBt
Period: 01/2007 – 02/2009
Lightweight ceiling structures made of layered high-performance concrete (SPP 1542) further details
Funding: DFG
Period: 10/2011 – 10/2014 – 1st period
11/2014 – 10/2018 – 2nd period
Possibility to accelerate the investigations of concrete fatigue under extremely high numbers of load cycles further details
Funding: DAfStb
Period: 01/2012 – 04/2016
Robotic Exploration of Extreme Environments further details
Funding: Helmholtz Association
Period: 10/2012 – 12/2017
Investigations on the influence of electrical, thermal and mechanical loading on material parameters as well as on electrical endurance of reinforced UHPC
further details
Funding: BMWi
Project management: PT Jülich
Period: 10/2013 – 03/2016