Oct 15, 2025
Testing New BÜ Features in PRESIM
Close-up showing BÜSA 14.1 and 14.8 with the new activation criterion “gE” (guaranteed activation): both crossings are not activated and can be used by road traffic (road symbol shown continuously). Signal A may display the “Proceed” indication because the crossings are secured by gE and the activation occurs in a timely manner. The other three BÜSA are activated directly before Signal 901 is set to “Proceed” (dashed road symbol).
The functions of the PRESIM system for signal box simulation are continuously being expanded as signal box technology evolves. The Chair of Railway Signaling and Transport Safety Technology supports the development of the PRESIM-specific requirements specification and the testing of new functions. The “Standard Communication Interface – Level Crossing (SCI-LX)” defines an EULYNX interface between level crossing safety systems (BÜSA) and signal boxes. At DB InfraGO, the new level crossing safety system monitoring mode “Route Monitoring” (FSÜ) is being developed, which combines the advantages of the existing monitoring modes Hp (travel restraint) and Fü (short closure times for road traffic).
Although this monitoring mode has not yet been put into practical use, it can already be configured and simulated in PRESIM. The Chair of Railway Signaling and Transport Safety Technology is designing and conducting tests on the new monitoring mode to verify the implementation of the FSÜ development in PRESIM and to support its further development.