Trans-IND
Projekt: Trans-IND - Integrated cost-effective construction process for transport infrastructures, based on a flexible industrialisation of FRP components
Projektlaufzeit: 01.06.2009 bis 01.06.2013
Budget/Finanzierung: 9,8 Mio / 6,1 Mio (total), 0,2 Mio (CIB)
Ziel:
The Trans-IND overall objective develop a cost-effective integrated construction process that will enable the maximum capability of industrialisation of components to transport infrastructures (road and pedestrian bridges, underpass, containing walls, acoustic and safety barriers) using polymer based materials. The Trans-IND system will be demonstrated, as a pilot case, for components of abridge (beam and pre-slabs) due to a higher complexity in bridge components manufacturing and assembly compare to other applications. The whole range of projects activities will cover the customer needs and requirements to specification for modular design considering the transport infrastructure, off-site components manufacturing, logistics, transport and on-site assembly together with ICT tools needed to manage and handle the whole process.
Projektpartner:
- MOSTOSTAL , Warszawa Polen (coordinator)
- ACCIONA INFRAESTRUCTURAS, Spain
- ACG (Advance Composite Group), England
- ASM, Polen
- Atos Origin, Spain
- D’APPOLONIA, Italy
- Fraunhofer-IPA-IAO , Germany
- Huntsman Advanced Materials, Swisserland
- ITIA-CRN (Consiglio Nazionale delle Ricerche-ITIA), Italy
- IVW (Institut für Verbundwerkstoffe GmbH), Germany
- Mikrosam, R. Macedonia
- SEMANTIC SYSTEMS S.A, Spain
- Solintel, Spain
- TECNALIA (FUNDACIÓN TECNALIA RESEARCH & INNOVATION), Spain
- TNO, Netherlands
- Universita Politecnica delle Marche, Italy
- Van Wees, Netherlands
- ZMRK, Slowenien
- TECHNISCHE UNIVERSITÄT DRESDEN
- Institut für Bauinformatik