Nov 23, 2026
The Chair of Air Transport Technology and Logistics has been awarded over €2 million under the EFRE InfraProNet 2021–2027 programme for RESPOND – Large-Scale EMC, RF and PNT Test System for the Validation of Resilient Communication, Navigation and Sensor
The Chair of Air Transport Technology and Logistics has been awarded over €2 million through the EFRE InfraProNet 2021–2027 programme to expand the research infrastructure at the Smart Mobility Lab (SML).
The Chair of Air Transport Technology and Logistics has been awarded over €2 million under the EFRE InfraProNet 2021–2027 programme for RESPOND – Large-Scale EMC, RF and PNT Test System for the Validation of Resilient Communication, Navigation and Sensor Systems.
The funding will support a targeted expansion of the Smart Mobility Lab's (SML) technical infrastructure. A central element is the enhancement of its approximately 400 m² electromagnetic compatibility (EMC) chamber with dedicated multichannel signal and spectrum analysis equipment, GNSS/PNT simulators, RF signal generators, software-defined radio systems and additional measurement and receiver hardware. These capabilities will enable reproducible investigations of communication and navigation systems under controlled electromagnetic conditions, including resilience testing against interference, jamming and spoofing.
Additional sensor systems for cooperative and non-cooperative detection and tracking of unmanned aircraft will extend experimental capabilities to the SML's outdoor facilities. Connecting laboratory-based testing with real-world experiments will establish an integrated environment for evaluating communication, navigation and detection functions, including those relevant to beyond visual line-of-sight (BVLOS) operations.
The infrastructure will be accessible to researchers across TU Dresden as well as external academic and industrial partners. It will support the development and validation of safety-critical technologies for autonomous systems and critical infrastructure protection.
Initial equipment installation is scheduled for spring 2027. The funding proposal was led by Dr.-Ing. Hannes Braßel.