C3 – finished projects – V1 and V2
SP C3-V1.1-X-d: Post-treatment methods as well as built-in parts within the joint research project C3-V1.1: Manufacturing and workmanship processes further details
Funding: BMBF / C3
Period: 12/2015 – 03/2018
SP C3-V1.2-I-a: Development and review of design and safety concepts within the joint research project C3-V1.2: Verification and testing concepts for standards and approvals further details
Funding: BMBF / C3
Period: 01/2016 – 12/2020
SP C3-V1.5-I-d: Conception large scale structures and specification „production“ as a part of the joint research project C3-V1.5: Demolition, dismantling and recycling of C³ structures further details
Funding: BMBF / C3
Period: 03/2016 – 06/2018
SP C3-V1.6-2: Durability of bridge caps within the joint research project C3-V-1.6: Bridge caps with carbon reinforcement further details
Funding: BMBF / C3
Period: 01/2017 – 11/2018
SP C3-V2.1-I-a: Static and cyclic long-term load as part of the joint research project C3-V2.1: Long-term behaviour of carbon reinforced concrete further details
Funding: BMBF / C3
Period: 09/2017 – 06/2020
SP C3-V2.3-I-a: CRC exposed to high temperatures as part of the joint research project C3-V2.3: Fire behaviour of CRC further details
Funding: BMBF / C3
Period: 05/2017 – 09/2020
SP C3-V2.5A-I-b: Simulation of the bond between carbon structures and concrete as part of the joint research project C3-V2.5A Stress-oriented carbon reinforcing bars further details
Funding: BMBF / C3
Period: 01/2019 – 02/2021
SP C3-V2.7-Ia: Design models as part of the joint research project C3-V2.7: Development of general concepts to strengthen existing concrete structures with CRC further details
Funding: BMBF / C3
Period: 05/2017 – 10/2020