Special topics
Concept visualization of a physical experimentation space for circular construction, based on the guiding principle of a ‘House of No Waste’
Resource-resilient transformation of the existing building stock more details
Funding: BBSR
Period: 12/2026 – 11/2027
Prestressed precast bridge girder with applied strain gauges applied to measure strain recovery during concrete sawing operations
Creep of old concrete more details
Funding: DFG
Period: 09/2026 – 08/2029
Test setup for investigating the embedding behavior of steel reinforcement in concrete
Stress-based design of RC structures more details
Funding: DFG
Period: 06/2026 – 05/2028
Residual stress measurement
SP in the joint research project Track-Bridge-Interaction (TraBI) more details
Contracting authority: DZSF
Period: 02/2025 – 01/2028
Freyssinet's Pont du Lucanzy over the Marne is one of the first prestressed concrete bridges
Prestressed concrete between success and failure more details
Funding: DFG / SPP 2255
Period: 10/2023 – 03/2027