R&D projects with textile and carbon reinforced concrete
C-Factory more details
Funding: BMWK
Period: 12/2025 – 11/2029
Subsequently shapeable reinforcements (NUCIB) more details
Funding: BMWE
Period: 08/2025 – 07/2027
Surface preparation of a prestressed concrete beam before strengthening
TP Fiber-optic within the joint research project Bridge life-time extension through strengthening with TRC (BEST) more details
Funding: BASt
Period: 01/2025 – 12/2026
Arch bridge prepared for waterproofing
Textile-reinforced sealing of arch bridges more details
Funding: BMWE / ZIM
Period: 10/2024 – 09/2026
Further development of conventional precast reinforced concrete elements into more material-efficient and climate-friendly precast carbon-reinforced concrete elements
Eco-concretes with carbon-fiber reinforcements (Congreen.Carbon.System – CCS) more details
Funding: BMWE
Period: 09/2023 – 08/2026
Finished R&D projects
Scaffold inside of silo 9, Nordzucker AG
Application including approvals
6-point bending test on a 4.5 m ceiling element
Wand- und Treppenelemente aus Carbonbeton