Concrete ligth – finished projects

CarboLight Bidge in the Deutsches Museum Munich
CarboLight Bridge as demonstrator for the SPP1542 projects of the IMB, TU Dresden more information
Funding: DFG / SPP 1542 | Institut für Massivbau, TU Dresden | Deutsches Museum München
Finished: 12/2021

Final report of SPP 1542
SPP 1542 – Coordination, central tasks and public relations further details
Funding: DFG / SPP 1542
Period: 07/2011 – 09/2014 (1st period), 10/2014 – 03/2022 (2nd period)

Pressure test with a slender column, clamped on both sides
Cross sectional adaption for rod-shaped elements in compression further details
Funding: DFG / SPP 1542
Period: 10/2011 – 10/2014 (1st phase), 11/2014 – 06/2020 (2nd phase)

Lightweight core layers for sandwich structures: infra-lightweight concrete, structural lightweight concrete, foam concrete
Lightweight ceilings made of layered high-performance concrete further details
Funding: DFG / SPP 1542
Period: 10/2011 – 10/2014 (1st period), 11/2014 – 10/2018 (2nd period)