Bridge construction
The semi-integral Scherkondetal Bridge with monolithically connected piers
Robust cross-sections for concrete piers of semi-integral viaducts more details
Funding: DFG
Period: 2025 – 2028
EMBED network
Generative bridge design (EMBED) more details
Funding: DFG / CARE
Period: 01/2026 – 12/2027
Train crossing during the load test
Recalculation of arched bridges more details
Funding: DB InfraGO AG, Frankfurt am Main
Period: 01/2023 – 06/2026
The Nibelungen Bridge in Worms as a demonstration project in SPP 100+
Coordination of SPP 2388: Hundred plus – Extending the service life of complex structures through intelligent digitalisation more details
Funding: DFG / SPP 2388
Period: 08/2022 – 02/2026 (period 1)
03/2026 – 02/2029 (period 2)
Planning of the sensor network for the Nibelungen Bridge in Worms
Design methodology for cross-life structural health monitoring with unknown damage process mehr Infos
Funding: DFG / SPP 2388
Period: 08/2022 – 02/2026 (period 1)
03/2026 – 02/2029 (period 2)
Bridge crossing Altenbekener Damm, Hanover
Railway bridges – Monuments in the network more details
Funding: DFG / SPP 2255
Period: 10/2020 – 09/2024 (Phase 1)
10/2024 – 09/2027 (Phase 2)
Prefabricated trough constructions made of UHPFRC on a railway arch bridge in Switzerland
Trough constructions on arch bridges more details
Funding: DB InfraGO AG, Frankfurt am Main
Period: 02/2020 – 01/2032
Finished projects – bridge building
Deconstruction of the Lahntal viaduct
Information about finished projects – bridge building – you can find here.