Oct 31, 2022
ETCS Neustadt
At the beginning of the winter semester 2022/2023, Scheidt&Bachmann has extended the interlocking simulation of our Neutstadt station by the interlocking control of the ETCS line between Neustadt and Waldhof. This completes the conversion of the former LZB line to ETCS Level 2 without signals. The RBC and the vehicle components have already been converted for some time.
This means that it is now possible to demonstrate ETCS from the point of view of the interlocking and from the locomotive driver's point of view in the laboratory practicals and seminars. The system is designed so that participants can drive interactively and actively explore the system behavior of ETCS Level 2.