Selected projects
Load test of a Polonceau truss in Sanssouci Park further information
Client: Stiftung Preußische Schlösser und Gärten, Berlin-Brandenburg, Potsdam
Period: 09 – 11/2022
Material investigation at the Unterrieden viaduct futher details
Client: MKP GmbH, Weimar
Start: 06/2022
AI-supported acoustic emission monitoring for automatic damage detection in supporting structures of wind turbines further details
Founding: Bundesministerium für Wirtschaft und Energie (BMWi)
Launched: 07/2020
Good prospects at the Wolfshügelturm further details
Period: 09 – 10/2019
Load test to determine experimentally the stabilty of the banisters
in the ‚Hülße-Bau‘ of TU Dresden further details
Period: 04/2019
Load tests of slabs at the Görlitz department store further details
Period: 03 – 09/2018
Load bearing test of the rehearsal stage of the Semperoper in Dresden further details
Period: 02/2017
Examination of a tieback at the hypar shell in Magdeburg further details
Period: 10/2017
Beyer-Bau in the test further details
Period: 01/2017
Balustrades „Silent Music“ further details
Client: SIB, NL Dresden I, Gruppe PBI
Period: 09/2016
Extension of the hall 285 of the Dresden Airport furhter details
Client: Stahlbau Brehna
Period: 08/2015
Stress tests on slabs made of steel and stone further details
Client: SIB, NL Bautzen, Fachbereich PBA
Period: 02/2015
Flagpoles at the Goldenen Reiter further details
Client: Landeshauptstadt Dresden
Period: 02/2014 and 08/2015
Vibration measurement and location determination of a gravimeter in the GeoSN further details
Client: SIB, NL Dresden
Period: 05 – 06/2013
Proof load of the masonry vault of the Schütz Chapel of the Dresden Royal Palace further details
Client: SIB, NL Dresden
Period: 04 – 06/2013
Stress tests on balconies of the Wohnungsgenossenschaft Post Dresden eG further details
Period: 06 – 07/2012
Structural safety of a historic balustrade made of sandstone further details
Client: SIB, NL Dresden I
Period: 09/2010
Simulation of behaviour of floor slabs under fire conditions further details
Client: SIB, NL Dresden I
Period: 04/2010
Proof load test on a ribbed concrete floor slab mehr Infos
Client: SIB, NL Dresden
Period: 04/2010
Pendulum impact tests on pedestals further details
Client: Staatliche Kunstsammlungen Dresden
Period: 03/2010
Load-bearing capacity of a granite slab further details
Client: KEK GmbH Laußnitz
Period: 09/2009
Static load test of a balustrade to receive approval for use of the building section for public events further details
Client: Festspielhaus Hellerau, Liegenschaftsamt Dresden
Period: 08/2009
Long-term measurement in the Dresdner Zwinger mehr Infos
Client: Freistaat Sachsen, vertreten durch SIB, NL Dresden
Period: 06/2009 – 01/2010
Static load test of reinforced concrete slabs further details
Client: Landeshauptstadt Dresden, Hochbauamt
Period: 05/2009