Diploma Theses 2026
Strachwitz, Romain
A house without copper – material flow analysis and substitution plan (2111)
Seidel, Josephine
Economic comparison of in-situ concrete and semi-precast construction methods in buil-ding construction, taking into account costs, construction time and other economic factors (2079)
No lending possible
Wobar, Johanna
Creating housing in urban areas through the conversion of existing buildings (2094)
Svadlenka, Ronny
Analysis of Statistical Construction Activity for the Development of a Forecasting Model (2082)
Hillig, Celine
Analysis of contaminants in wood construction and their effects (2086)
Meissner, Marie
Circularity and Life Cycles of Construction Containers - Current Status and Potential (2090)
Pohl, Albert
New Build vs. Renovation in Residential Construction – A Systematic Analysis of Decision-Making Factors (2097)
Franz, Dominik
Approaches to reducing red tape in housing construction (2099)
Schulze, Pauline
Analysis of vacant buildings and their potential (2093)
Köcher, Julia
Comparison of Total Contract Awarding (TU) and Individual Lot Awarding Regarding Their Value Creation (2102)
No lending possible
Grunze, Tim
Reducing bureaucracy in housing construction from a building contractor’s perspective (2098)
No lending possible
Rapp, Lara
Making circularity in the construction sector measurable – indicator-based assessment and integration into sustainable decision-making processes (2101)
Adams, Manja
Business models for a circular timber construction industry (2081)
Scholz, Martin
Technical assessment of the material recycling of crushed concrete sand and concrete gravel from the demolition of carbon concrete (2105)
Fuß, Gabriel
Development of a catalogue of criteria for the awarding of early-stage projects as part of the partnering procedure (2110)
Hohmann, Max
BIM-supported earthworks and civil engineering logistics as well as machine control under flat-rate contract conditions – digital planning, execution and control using the example of the Bauerfeind extension building in Zeulenroda (2080)
No lending possible
Gladewitz, Jeremias
New-build projects caught between the challenges of vacancy rates and the utilisation of existing stock (2095)
Seidler, Marvin
Design and development of an AI agent to provide operational support to a construction company (2114)
Wentzel, Augustin Christian
Analysis of deconstruction technologies in timber construction for the reuse of building components (2087)
Steffens, Johannes
Material Availability and Scalability – Opportunities and Limitations of circular building materials (2092)
Haggenmiller, Emely
Analysis and Design of a Reuse Materials Catalog for the teaching module ‘Circulation-friendly planning and construction‘ (2088)
Pester, Jonas
Analysis of wood species and biological damage mechanisms (2085)
Bledowska, Zuzanna
Consideration of environmental protection aspects in the event of major fires (2078)
Füssel, Erik Wilhelm
Effective and resource-efficient preservation of existing structures: International benchmarking of carbon reinforced concrete (2074)
Walther, Clemens
Spectral analysis of the hardening behaviour of different concrete compositions (2075)
Bamberger, Annelie
Adjustment requirements for construction activity statistics (2073)
Krack, Benedikt
Energy-economic evaluation of different (hybrid) heat generation systems for existing buildings in rural areas (2070)
Münchmeier, Marlena
Surface evaluation of additively manufactured concrete components (2071)
Lange, Annika
Economic analysis of construction robotics applications in practice (2068)
Lauckner, Anna
Development of a recyclable construction site container in accordance with EU taxonomy and sustainability certifications (2064)
Kalleja, Damian
Analysis of the retrofitted addition of storeys to residential buildings as an approach to inner-city housing densification (2072)
Van der Drift, Carolin
Concrete 3D printing: standardisation of the planning and construction process as the basis for increasing market penetration (2061)
No lending possible
Schnitzer, Paula
Potential Analysis of Sensor Technology Applications on Construction Sites (2067)
Hegler, Isabell Caroline
Potential analysis for the use of renewable energies in construction site facilities (2063)
Keßler, Pauline
Methods for Personalized Detection and Evaluation of Emission-Based Hazards (2062)
Matzke, Stefanie
Building pollutants in the building fabric as an obstacle to urban mining (2039)
Sabban, Ann-Sophie
Awarding of major construction projects: EU competitive tendering with subsequent negotiation procedures (2066)
Tillack, Tobias
Fundamental investigation into marketable structural solutions for the large-scale utilisation of geothermal energy (2044)
Wolfs, Freya
Acceptance of low-tech buildings (2060)
Zollner, Milena
Analysis of the potential of circular building expansion (2036)
Kellner, Vico
Potential analysis of existing office space that can be converted into new living space using the example of Berlin (2055)
Fabeck, Eric Leander
Application and Evaluation of Innovative Electricity Procurement Models on Construction Sites (2058)