Selected projects – sampling on structures and in situ tests

Damage documentation at an arch bridge in Berlin
Structural diagnosis on vault bridges further information
Client: DB Netz AG (Hanover, Nürnberg, Berlin and Leipzig)
Period: since 04/2022

Historic Polonceau truss in the remise of Sanssouci Park
Load test of a Polonceau truss in Sanssouci Park further information
Client: Stiftung Preußische Schlösser und Gärten, Berlin-Brandenburg, Potsdam
Period: 09–11/2022

Unterrieden viaduct during incremental launching of the new superstructure (left) next to the old one (right)
Material investigation at the Unterrieden viaduct futher details
Client: MKP Weimar
Period: since 06/2022
AI-supported acoustic emission monitoring for automatic damage detection in wind turbine structures further details
Founding: BMWi
Launched: 07/2020
Good prospects at the Wolfshügelturm further details
Period: 09–10/2019

Test set-up at the main staircase
Load bearing capacity of banisters
in 'Hülße-Bau' of TU Dresden further details
Period: 04/2019

Loading frame
Load tests of slabs at the Görlitz department store further details
Period: 03–09/2018
Load bearing test of the rehearsal stage of the Semperoper in Dresden further details
Period: 02/2017
Examination of a tieback at the hypar shell in Magdeburg further details
Period: 10/2017
Beyer-Bau in the test further details
Period: 01/2017
Balustrades „Silent Music“ further details
Client: SIB, NL Dresden I, Gruppe PBI
Period: 09/2016
Extension of the hall 285 of the Dresden Airport furhter details
Client: Stahlbau Brehna
Period: 08/2015
Stress tests on slabs made of steel and stone further details
Client: SIB, NL Bautzen, Fachbereich PBA
Period: 02/2015
Flagpoles at the Goldener Reiter further details
Client: Landeshauptstadt Dresden
Period: 02/2014 and 08/2015
Vibration measurement and location determination of a gravimeter in the GeoSN further details
Client: SIB, NL Dresden
Period: 05–06/2013

Loading frame and tie rods under the test yoke
Load test of the masonry vault of the Schütz Chapel of the Dresden Royal Palace further details
Client: SIB, NL Dresden
Period: 04–06/2013

stress tests on balconies
Stress tests on balconies of the Wohnungsgenossenschaft Post Dresden eG further details
Period: 06–07/2012
Structural safety of a historic sandstone balustrade further details
Client: SIB, NL Dresden I
Period: 09/2010
Simulation of behaviour of floor slabs under fire conditions further details
Client: SIB, NL Dresden I
Period: 04/2010
Proof load test on a ribbed concrete floor slab mehr Infos
Client: SIB, NL Dresden
Period: 04/2010
Pendulum impact tests on pedestals further details
Client: Staatliche Kunstsammlungen Dresden
Period: 03/2010
Load-bearing capacity of a granite slab further details
Client: KEK GmbH Laußnitz
Period: 09/2009

Experimental set-up during the load test
Static load test of a balustrade to receive approval for use of the building section for public events further details
Client: Festspielhaus Hellerau, Liegenschaftsamt Dresden
Period: 08/2009

Frequency analysis of a pre-stressed anchor
Long-term measurement in the Dresdner Zwinger more information
Client: Freistaat Sachsen, vertreten durch SIB, NL Dresden
Period: 06/2009–01/2010
Static load test of reinforced concrete slabs further details
Client: Landeshauptstadt Dresden, Hochbauamt
Period: 05/2009