Bond and cracking – finished projects
Crack width development of RC under long-term loading based on local bond relationships – KEK more details
Funding: BMUV
Period: 03/2020 – 02/2023
Behaviour of concrete and posttensioning steel under transverse tension
further details
Funding: BMWi/GRS
Period: 07/2012 – 09/2015
Evaluation the reliability level of components with small separating cracks more details
Funding: Ministerium für Landwirtschaft, Umwelt und Verbraucherschutz Mecklenburg-Vorpommern / Länderfinanzierungsprogramm „Wasser, Boden und Abfall“
Period: 03/2011 – 02/2012
2D photogrammetry for the recording of cracks further details
Funding: AiF
Period: 03/2010 – 10/2011
Limit states of small crack widths in sealing structures made of steel-reinforced concrete more details
Funding: DIBt
Period: 01/2010 – 12/2011
Bond behaviour of HPC and reinforcing steel under fatigue loading (data base) further details
Funding: IMB der TU Dresden | DAfStb
Period: 2009
Serviceability models in accordance with German RC Commission Guideline on Steel-Fiber Reinforced Concrete (SFRC) further details
Funding: DAfStb
Period: 03/2008, 12/2008, 01/2009
Effect of transverse tension and fatigue on bond between concrete and reinforcing steel further details
Funding: DFG
Period: 04/2007 – 03/2009 (1st funding phase), 11/2009 – 03/2012 (2nd funding phase)
Influence of transverse tension on cracking and bond in reinforced and pre-stressed concrete containments further details
Funding: BMWi/GRS
Period: 04.2007 – 01.2011
Enhancement of the prediction accuracy of small crack width further details
Funding: DIBt
Period: 01/2007 – 02/2009
Crack behaviour of cast-in-situ concrete piles further details
Funding: DEGES | SMWA
Period: 2003 – 01/2006
The bond behaviour of high performance concrete and reinforcing steel under fatigue loading more details
Funding: Drittmittel
Period: 04/1997 – 06/2005